Twiga Cement – Boosting Productivity with Unilyzer 900

Twiga Cement - Boosting Productivity with Unilyzer 900

At Twiga Cement’s Wazo Hill facility, one of Tanzania’s largest cement manufacturing sites, unexplained motor shutdowns, lost production hours, and disputes with the national utility were common and costly. With medium-voltage motors driving critical processes, even a short disruption meant hours of lost output and revenue.

A Unilyzer 900 was deployed to capture detailed electrical performance data throughout their medium-voltage network and at their utility interface. Key findings in brief were:

  • Pinpointed the source of electrical disturbances
  • Time-stamped, standards-compliant data made discussions with utility fact-based and constructive
  • Utility used the data to fine-tune feeder protection, preventing unnecessary plant trips
  • Optimized protection settings allowed 11 medium-voltage motors to ride through harmless disturbances
  

Reduced downtime translated to significant production gains and profitability. ROI was immediate, payback period estimated under 3 months.

“With the Unilyzer 900, we moved from assumptions to facts. We reduced nuisance motor trips, improved coordination with the utility company, and gained real production reliability. This is not just a tool – it’s an investment in uptime and peace of mind.” Said Eng. Kassim Khalfan K.